We develop, finance, build and operate the channels through which a state measures, reconciles and records its oil, gas, metals, minutes, money and data.
Watch the film↓Schematic: the disc is a nation's value; the two channels are where flows are measured.CFA / HOME
Act 01 · The disc
A state can only govern what it can measure.
The disc is a nation's value. Its slabs are how we work: develop (C), build (F), operate (A). The channels between them are where flows pass, and where we measure.
Act 02 · The flows
Six flows carry public value across two channels.
Oil and gas at custody transfer, metal at the exit point, minutes and data at the operator's switch, money in the issuer's ledger. The operator keeps its own meters, switches and ledgers.
Act 02 · Every crossing ticked
We add a second evidence chain beside the operator's, never a takeover.
It reads copies through one-way data diodes, copy-only taps and read-only interfaces. Every reading is signed and time-stamped at the edge by a device-bound key. Nothing writes into an operator's control system.
Act 03 · The gap
Revenue that a third party reports is almost always declared.
Where the measured and the declared record part, value leaves the state. A randomised tax-audit experiment measured the difference:
0.3%0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.
37%37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
Evasion rate on self-reported income in the same experiment.
Illustrative The gaps on the stage are schematic; the two bars are drawn to scale from the published rates.
Act 04 · Reconciliation
Reconciliation closes the gap one row at a time.
Versioned rules compare measurement with verification, cargo with declaration, bill of lading with outturn, usage with billing, invoice with payment. Ship, shore and tank figures are three readings of one crossing.
Act 04 · Exceptions
Every variance opens a case, and a named public officer decides.
No algorithm approves an adjustment, and duplicate candidates are held, never merged automatically. The system prepares the evidence and proposes. The operator never assesses, collects, seizes or enforces.
Act 05 · The record
Every flow, on the record.
Each reconciled event is sealed: signed at capture, written once, chained by hash and replayable by an auditor from its evidence manifest. Where we are paid from the service, we are paid only on a registered, verified record.
One firm answers for the programme, from first study to final hand-over.
The three slabs of the mark are the three phases of every programme. One team carries all three, so the evidence chain is designed into the feasibility study and run by the people who built it.
CDevelop
We prove the project before anyone builds it.
Market studies and feasibility, every figure graded and sourced
Business plans and open-book financial models
Concession and PPP structuring
Financing without a state guarantee where the service pays for itself
The less a third party reports, the more goes missing.
Two bodies of published evidence point the same way: misreporting falls where someone else also reports.
0.3%0.3%Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
Evasion rate on income reported by third parties (employers, banks) in a randomised tax-audit experiment.
37%37%Evasion rate on self-reported income in the same experiment.Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011. Open the publication ↗
Evasion rate on self-reported income in the same experiment.
Bars on one axis, drawn to scale from the published rates. Source: Kleven, Knudsen, Kreiner, Pedersen and Saez, Econometrica 79(3), 2011.
1%1%Net misreporting rate on income subject to substantial information reporting and withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗
Net misreporting rate on income subject to substantial information reporting and withholding.
5%5%Net misreporting rate on income subject to substantial information reporting without withholding.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗
Net misreporting rate on income subject to substantial information reporting without withholding.
55%55%Net misreporting rate on income subject to little or no information reporting.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗
Net misreporting rate on income subject to little or no information reporting.
Bars on one axis, drawn to scale from the published rates. Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019).
Twelve sectors
Twelve sectors, one discipline: measure the flow where it crosses.
Each sector has its own flows and channels. The method stays the same: an independent reading at the crossing, a reconciliation, a sealed record.
Sector 01 of 12
Oil and gas
Custody-transfer measurement at every boundary crossing, feeding a national hydrocarbon ledger.
0.3%0.3%Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).Source: OIML R 117-1:2019, Dynamic measuring systems for liquids other than water. Open the publication ↗Maximum permissible error of an accuracy class 0.3 dynamic liquid measuring system (custody transfer of crude oil and products).
Scan, assay by XRF and match the export certificate. No certificate, no exit.
77%77%Share of gold in that estimated extractive under-invoicing.Source: UNCTAD, Economic Development in Africa Report 2020. Open the publication ↗Share of gold in that estimated extractive under-invoicing.
Mine-to-port reconciliation of weighbridge, assay, rail and port tonnage.
EITI Standard 2023EITI Standard 2023Extractive Industries Transparency Initiative global standard.Source: Standard body publication: EITI Standard 2023. Open the publication ↗Extractive Industries Transparency Initiative global standard.
Revenue assurance across voice, SMS, data, roaming and mobile money.
USD 38.95bnUSD 38.95bnEstimated global telecommunications fraud loss in 2023, about 2.5 percent of telecom revenues.Source: Communications Fraud Control Association, 2023 Global Telecommunications Fraud Loss Survey. Open the publication ↗Estimated global telecommunications fraud loss in 2023, about 2.5 percent of telecom revenues.
Registry interoperability, identity verification and government payments.
850 million850 millionPeople worldwide estimated to lack an official proof of identity.Source: World Bank, Identification for Development (ID4D) Global Dataset 2021. Open the publication ↗People worldwide estimated to lack an official proof of identity.
Maritime domain awareness, port community systems and bunkering measurement.
Over 80%Over 80%Share of world merchandise trade by volume carried by sea.Source: UNCTAD, Review of Maritime Transport. Open the publication ↗Share of world merchandise trade by volume carried by sea.
Single windows, electronic-seal transit monitoring and mirror-trade analysis.
UN/CEFACT Recommendation 33UN/CEFACT Recommendation 33Recommendation and guidelines on establishing a single window.Source: Standard body publication: UN/CEFACT Recommendation 33. Open the publication ↗Recommendation and guidelines on establishing a single window.
Feeder metering, revenue protection, loss analytics and project development.
600 million600 millionPeople in Africa without access to electricity, about 43 percent of the population.Source: International Energy Agency, Africa Energy Outlook 2022. Open the publication ↗People in Africa without access to electricity, about 43 percent of the population.
Water balance, district metered areas and performance-based contracts.
126 billion m³126 billion m³Estimated volume of non-revenue water lost by utilities worldwide each year.Source: Liemberger and Wyatt, Water Supply 19(3), 2019. Open the publication ↗Estimated volume of non-revenue water lost by utilities worldwide each year.
Toll-road and bridge concessions, tolling systems and construction finance.
USD 68bn to 108bnUSD 68bn to 108bnEstimated annual infrastructure financing gap of Africa.Source: African Development Bank, African Economic Outlook 2018. Open the publication ↗Estimated annual infrastructure financing gap of Africa.
E-invoicing clearance, levy rule engines and third-party information reporting.
55%55%Net misreporting rate on income subject to little or no information reporting.Source: US Internal Revenue Service, Publication 1415, Tax Gap Estimates for Tax Years 2011 to 2013 (2019). Open the publication ↗Net misreporting rate on income subject to little or no information reporting.
Plot geolocation and traceability from plot to port.
Regulation (EU) 2023/1115Regulation (EU) 2023/1115EU regulation on deforestation-free products: geolocation of production plots and due-diligence statements.Source: Standard body publication: Regulation (EU) 2023/1115. Open the publication ↗EU regulation on deforestation-free products: geolocation of production plots and due-diligence statements.
Preparation runs at the developer's own cost and risk before the contract is effective. That is why go-live can follow within about ninety days of the effective date, an illustrative timeline.
IllustrativeTimeline from our delivery model; actual phases depend on the programme.
Pre-effective preparationDays 1 to 30Days 31 to 60Days 61 to 90
Then steady operation, a renewal wave at mid-term and a hand-over programme in the final years. Concession terms commonly run 15 to 20 years Illustrative range
Six working instruments let a reader test our arguments with their own numbers. The first one counts interfaces: move the slider.
Illustrative
66bilateral links, one per pair of registries, n(n-1)/2
12links through one exchange, one per registry
Request a briefing
Start with one flow and the two records that describe it.
A briefing takes the flow you care about, the records that exist today and the channel where an independent reading would sit. We come back with a structure, a timeline and a financing route.